Our granite fabricator called this morning to inform me that when they layed the templates on our two slabs of granite, it was clear that we would need a third slab to do it all. The good news is that the additional granite is in stock and will be available tomorrow for the layout. Cutting is scheduled for Thursday and the installation may happen as early as next Monday! The bad news is that we have to pay for the additional time and material.
I resumed installing flooring in the hallway, and spent a lot of time making meticulous jigsaw cuts in the boards for the frames at the base of the stairs and closet door.
|
Cutting pattern |
|
Cut board installed at base of stairs | | | |
|
|
|
Tools for installing flooring |
|
|
Flooring installed with custom cuts under closet door frame |
|
|
Closet flooring with boards selected for the next four rows |
|
Hallway flooring at the end of the day |
|