I spent the entire day getting the dishwasher installed and leveled, along with a support structure to secure it to the cabinets. It is now wired to the circuit breaker and lines for the water supply and drain are connected. Once we have a sink and disposal, I'll connect the other ends of the water lines under the sink, test for leaks and give the dishwasher a smoke test. I also got the second spice rack installed next to the dishwasher to complete the main kitchen lineup, as seen below..
Amanda put Post-it Notes on the cabinets to designate what will go in them, and started transporting some items that we've been temporarily storing in the dining room cabinets.
|
Kitchen cabinets labeled with Post-it Notes |
|
Unloading the dining room cabinets |
|
|
Since we won't have a wooden counter top to support the dishwasher, I made a frame to do the job. This supports both the dishwasher and the spice rack
|
Dishwasher and spice rack with cross-bars tied into adjacent cabinet and wall stud |
|
|
Support structure detail with angle brackets and screw into wall stud | |
Tomorrow I will work on the AC outlets and floor bracing for the island. My goal is to complete the island on Friday.
I *love* the look of the new dishwasher. Things are coming together nicely!