Sunday, June 19, 2011

Happy Father's Day!

The girls took me to Legal Seafood for lunch today, followed by a stop at my favorite store - Home Depot!  Among other goodies, we got a couple of nifty utility knives to replace the clunky old one that we'd been using.  They are so cool that they even come with a belt clip!  I know I'll be wearing mine with pride.

Upon our return, Sharron and I measured the gaping hole that I made for the vent fan duct work and cut out a piece of drywall to fill the space.  I extended the wiring for the fan and ran it out through a hole in the new piece of drywall.  We spackled in some drywall tape and left it to dry overnight. 






Here's the drywall that we installed yesterday to correct the bent section near the door to the deck with some additional spackling.  Hopefully, one more application should give us a "perfect" surface.   






















I nailed in the 3" wide strips of drywall that Sharron had cut to start filling in the gap created by the removed divider wall.  I'll wrap this up tomorrow and give it the first coating of spackling.
























Now for a word about spackling.  We've been using relatively small buckets of stuff that is pink when wet and white when dry.  The problem is that we can't get this in a large enough container to supply the massive amounts of goop that we've been slapping into the cracks in the walls.  So, today we got a 4-1/2 gallon bucket of spacking that is supposed to create less dust.  We'll find out tomorrow when I sand what we applied today.

Friday, June 17, 2011

Getting it Straight

Today we tackled the bent wall section at the end of our kitchen cabinet line-up.  We smashed and ripped out a 23" wide section from the floor up to about the 7 foot level and installed shims to bring the support structure out to where it should have been when the house was built.  We are doing this in three sections of wallboard.  The bottom section was relatively easy, but the next one took some work.  Sharron came up with the clever idea to make a pattern of the electrical boxes on paper and then transfer them to the drywall that we would install over them. 



Note the shims on the studs.  We nailed the drywall to the shims, which vary in thickness from the floor to the ceiling level
I spent most of the day getting wires run for the last under counter light, microwave outlet, and a switch and outlet for the sink light.  The drywall above the kitchen window is on solid wood all the way to the ceiling, so I had to surface mount the outlet and cut a channel in the drywall to route the wire to the switch.  It will all be covered by the cabinets, but I would have preferred a more conventional installation!


Amanda rolled the first coat of paint on the east wall.  The paint we are using has a primer in it and is so thick that a second coat is hardly needed. 









I installed some new switch/outlets to replace the old stuff and applied some drywall tape and spackling on the two sections of wall board that we installed today.  Here's how it looked as it dried tonight.

Thursday, June 16, 2011

Venting!

You may recall that the new kitchen design requires the oven to move over to the right about a foot.  As the oven goes, so does the vent fan and associated ducting in the wall.  Of course, the new vent fan is centered on a wall stud, which I cut with our Sawzall, and later braced with some spare 2x4's.  I installed a pre-fab 90-degree duct and built a small extension with some nifty right angle sheet metal pieces.  Now we can seal off the wall with some new drywall, and when the cabinets are in place, we will cut out a 10-1/2" by 3-1/2" section of drywall and ducting for the new exhaust.

The next task for today was to install a new dimmer switch for the kitchen under-cabinet lights and an outlet for the counter to the left of the stove.  I snaked some wire over to the stove outlet to tap into the AC power, but found that the original outlet did not securely hold onto the wire that was previously installed.  This was a good opportunity to use a spare GFCI (ground fault circuit interrupter) outlet, which should be used in wet environments in any case.  This GFCI outlet also protects the other wall outlets that are wired in parallel.  Just think, we can put our hands in the wet sink and touch the electricity without being electrocuted.  Or, so the theory goes.



Here's the new appliance outlet and dimmer switch with the decorative faceplate removed.  The wire hanging out of the wall will feed the dimmer light above the counter to the left of the stove.  .


The circuit continues along the wall to a second light feed for the corner cabinets.  Tomorrow, I plan to run the final extension of the dimmer circuit to the cabinet to the right of the sink.  The sink will have a separate light installed, and the stove top has lights in the vent that will be installed with the cabinets.




The corner walls of the kitchen  had an exposed gap, so I spackled in some tape to seal it up. Most of this will be hidden by the wall cabinets, but I wanted to close any air leak while I had the chance.




The existing floor boards in the dining room have an uneven edge, due to the original dividing wall. 
          










Our new Dewalt router arrived this week, and I have the 3/4" cutting bit installed and the cutting depth set to 3/4".  We also have an edge guide that we will attach to the router to enable us to cut a straight, smooth edge for the interface to the kitchen flooring that we will install next week.  We have to perform the same operation in the hallway for the existing floor boards in the family room and living room.

The yellow ring reads out the cutting depth in 1/64" increments.  Here it is set to 3/4."

Wednesday, June 15, 2011

Tuesday, June 14, 2011

Drywhhoaaaaaaaaaaa!!!

Today....we had a rather amusing and frustrating incident.

We made our usual trek to Home Depot this afternoon to buy a great many items for the kitchen.  Most sizably - the metal edge strips, a piece of drywall (incorrectly labeled Drywal on the signs), and molding strips.  As we took my car (the one with the roof rack), Dad strapped the drywall and metal corner strips to the roof so we could make it home.  About 2 minutes (and a non-existant wind gust) in, the 8 foot long section of drywall snapped and a portion of it went flying into the road behind us.  So after pulling off the road (near a cemetery), we re-secured the remaining drywall...and drove home.



Dad did some wiring work and we were left with this lovely display.  The wall switches are ready to mount in the wall extension, which we will build after we have routed the ends of the existing floorboards in the dining room.  We'll get pictures of that operation tomorrow when we will hopefully know how to use the router.





























These last few pictures are illustrating the amazing job that the original builders did while constructing our house.  Seen here is the 5/8" gap in the wall at the door frame, caused by the sudden change in direction of the last 2 feet of wall.  When Mom is home on Friday, we will remove that entire part of the wall and install a new joist support structure and new drywall.  This is necessary to provide a consistently flat surface for the granite backsplash.  Granite doesn't bend around corners too well!






Monday, June 13, 2011

Going, Going, Gone!

Today we severed the cord and disconnected the disposal, sink and dishwasher.  Next, we ripped out the base cabinets to reveal a not so tidy wall. 

Sharron donned her face mask and cleaned the walls with Chlorox wipes.


The Sawzall made short work of the counter top.












Here's the final state after the cabinets were pulled out and Sharron removed the linoleum tile, along with the requisite zillion stables.

I have a lot of wiring and duct work to do in this area.  Note the water pipes running along the wall, right in the way of the backs of the new cabinets, which will have to be shimmed out about an inch from the wall.


Meanwhile, I drilled holes in the wall frame to provide a new path for the wires to the light switches that will be installed on the small section of wall that we are building.


















The two dangling switch boxes are the ones that will be relocated tomorrow.  Then we can wrap some drywall around them, slap a little spackling on them and call it a wall.

Sunday, June 12, 2011

Sunday Sales

Not much happened in the way of construction (or destruction) today.  The excitement of the day was purchasing our new fridge and dishwasher!  We are scheduled for a delivery of both appliances (and a haul away of the old) on Tuesday the 21st.  This gives us a little over a week to get the remaining cabinets ripped out and the flooring done.

We also made another lovely trip to the dump, but apparently decided not to take pictures.  We were mostly disposing of plaster (from the removed wall), so it wasn't nearly as visually riveting as our last trip.  Of course, the day wouldn't be complete without a trip to Home Depot.  We bought some electrical stuff (wires and some sort of boxes that seem to be vaguely important for outlets) and safety goggles for the parental units.  Don't worry, I already have some pretty sweet safety glasses of my own (courtesy of my internship last summer).

Anywho, Mom has taken the day off tomorrow and we have plenty to do.  Monday will (hopefully) consist of:

  • Painting the two completely exposed kitchen walls
  • Completely removing the cabinets, sink, and dishwasher
  • Working on the duct above the stove
  • Wiring stuff (moving electrical outlets to more desirable locations)
  • Finally organizing all of the utensils in the new drawer dividers (purchased yesterday)
Don't worry - tomorrow I promise to actually have photos!