Friday, July 15, 2011

Molding and Kickboard

 While we waited for the delivery of our replacement floor nailer, we measured, cut and installed about 40 feet of shoe molding along various walls, and cherry veneer on all of the kick board surfaces.  Quarter round will be added later.

Kickboard veneer and molding in the dining room

Sharron disassembled the remaining old cabinets on our deck.  We have a lot of debris to haul to the dump when we get the chance.




 Our new nailer arrived at 3:30, but we still have to attach the handle, etc. before we can use it, so I decided to try our repaired nailer, just to see if it really worked.  Ye of little faith may be surprised to learn that it works perfectly well!  So, tomorrow we will put the new nailer to work and finish the flooring.  

New floor nailer in the box


Oh, and the counter top installation is scheduled for Monday - all day.

Thursday, July 14, 2011

Love Those 30-day Warranties!

Broken percussion head

After nailing in a few boards this morning, the rubber head popped off of our new floor nailer!  Fortunately, it is still within the initial 30-day warranty period, and I was able to convince Amazon.com Customer Service to ship us a new nailer with one-day delivery.  So, we should still be able to finish the flooring this weekend.


And, in case I get impatient, I can give our "repaired" nailer a try.  I'm dying to see if it works with the duct tape to keep the head from popping off.  After all, duct tape fixes anything, right?

Hey, don't laugh - I bet it will work!














With the nailer out of commission, I switched my attention to working on the transition between the old floor in the family room and the new floor in the hallway.  After determining how much to cut off of the new boards to create a smooth line, I used a piece of finished pine as a straight edge to guide the router.


Uneven floor boards before trimming with router

The router can't reach the end boards near the walls, so I used our small pull saw to slowly cut away the excess from two boards to complete the cutting phase of this project.

Pull saw for trimming end boards

Pull saw detail



The next step was to cut a floor board to size and route, then sand along the length for a close fit between the two areas.  It took about 10 attempts to slowly cut the board to the proper width with our belt sander, but I had to start with one over-sized to avoid any large gaps in the installation.  Here's the finished product:

1-7/8" wide spacer board for transition between old and new flooring

We are down to our last two boxes of floor boards, which just might be enough to finish the job.  We'll find out this weekend!

View from family room toward kitchen

Wednesday, July 13, 2011

Out of the Closet

This morning, I finished working my way around the closet frame and installed flooring about two feet or so toward the front door before I had to quit for lunch and a visit to our granite fabricator.

The third slab arrived today and Amanda and I went out to inspect it and work with the fabricator on what parts of the stone we wanted to include in the various counter tops.  Here's the third slab:


 While we were admiring the granite, I noticed that one of the workers was cutting the hole in our vanity marble top for the soap dispenser.  The sink cut-out had been polished and the faucet hole was already drilled.  Here's the soap hole being drilled:


Amanda provided some invaluable inspection services for the granite.  The blue lines are the approximate locations of the various pieces for the kitchen sink area, dining room and island.






















Our granite with templates


When we got back home, I nailed in a few more rows of floor boards and called it a day.  Here's how it looks at present.  As part of the finishing work, we will install quarter round to hide all of the board ends for a neat appearance.



Interface between old boards in living room and new boards in hallway

Transition detail

Tuesday, July 12, 2011

You're Gunna Need Another Slab!

Our granite fabricator called this morning to inform me that when they layed the templates on our two slabs of granite, it was clear that we would need a third slab to do it all.  The good news is that the additional granite is in stock and will be available tomorrow for the layout.  Cutting is scheduled for Thursday and the installation may happen as early as next Monday!  The bad news is that we have to pay for the additional time and material.
 
I resumed installing flooring in the hallway, and spent a lot of time making meticulous jigsaw cuts in the boards for the frames at the base of the stairs and closet door.

Cutting pattern
Cut board installed at base of stairs





Tools for installing flooring
Flooring installed with custom cuts under closet door frame















Closet flooring with boards selected for the next four rows

Hallway flooring at the end of the day




Monday, July 11, 2011

Templates

This morning I cleared off the counter tops and screwed in the two spacer boards that I had installed last night on the sides of the dining room base cabinets.  The counter top fabricator representative arrived at 9:30am and brought with him a bucket containing a hot glue gun, lots of glue pellets and some short pieces of wood marked for various standard counter top overhangs for the cabinet tops.  He also brought in a lot of long, thin wood strips and an 8-foot long straight edge.

Tacking wood strips with hot glue to create a template

The wood templates will be placed on our granite, which will then be cut with a diamond tipped, water-cooled circular saw blade in the shop.

Kitchen cabinets with completed templates

Completed island template with 12-inch overhang 


The fabricator rep packed up and left the scene at 4pm - a long day for me sitting and watching someone else work for a change.

I plan to drop by the fabricator's shop tomorrow morning to participate in the template layout on the granite to choose the best area of the two slabs we have stored there.  The vanity was also templated for the marble counter top.  Cutting will occur later this week and delivery and installation should be sometime next week.  We can't wait!

Sunday, July 10, 2011

Slackin'

With the critical mass behind us, I took it easy today and installed 6 pull bars on the island drawers, so Amanda can load them up.  Another 3 drawers will have to wait for smaller bars than the ones provided (sound familiar?)

Six island drawers with pull bars installed
This evening, I cut two filler strips for the sides of the dining room base cabinets.  They are held in by friction only, and I will secure them with screws in the morning.

Dining room spacer installed between drawers and wall

I also made printouts of the dimensional drawings for the faucets and soap dispenser for the kitchen and powder room.  I will give these to the fabricators tomorrow.  They will also take the two sinks and pre-install them in the counter tops as part of their fabrication process.

I still have to clear all of the tools off of the sink area cabinets, as well as miscellaneous items on the dining room cabinets for the counter top measurements tomorrow.  Arrival time of the crew is TBD at this moment.

Saturday, July 9, 2011

Island Panels

Today, I completed the island construction with the installation of the two back panels, one six feet long and one four feet long.  Both were quite heavy!  The pull bars for the cabinet doors and drawers will be installed tomorrow, and the kick space veneer will be one of the last bits of detail work at the end of the project.  We are now ready for the granite fabricator to take measurements on Monday.  Actually, they make templates to achieve a more precise pattern.  Stand by for some photos of that process in Monday's blog. 


Here is one of the 96-inch long panels ready for cutting to size.

Level clamped to wood as an edge guide for the jig saw

While I cut the panels, Amanda did a bang up job of cleaning the stainless steel surfaces in the kitchen and then organizing and cleaning a lot of the stuff we had piled into the living room to clear space for the construction project.



For lunch today, we fired up the grill around 10:30 and filled a pan with chicken thighs slathered with some yummy BBQ sauce.  Here it is ready to come off the grill after achieving a 190-degree internal temperature.  We spooned some of the sauce onto some baked beans to enhance them as well.  Who says you can't cook just because you don't have a kitchen!?

Very yummy BBQ chicken


Drilling pilot holes for decorative panels

After lunch, I brought in the cut panels and screwed them into the backs of the cabinets.

**Comment from Amanda: Please note Dad's patented technique of bending over, making his body almost U-shaped, to drill the holes.  Somehow, this was successful for him.  But mostly, it was amusing for me. :)






























Here are a couple of photos of the island with the panels installed:

View from kitchen stove area

View from the dining room